|
|
||
Easi-Set Precast Concrete Buildings Testimonials![]() SargeantCombat Training Facility “Our organization found Easi-Set
Buildings to be extremely adaptable
and easy to install at our training facility. With
over 35 units delivered and set, the Easi-Set Buildings’ versatility
of configuration provided us a realistic setting for training
for our Troops in urban combat plus the stackability allows
us to plan real-life combat scenarios.”
Patricia J. Knox, Project Manager “As this pump station is located in an established neighborhood, the Town was concerned that the building would not match the surrounding residential architecture. Your firm provided an excellent building design with a gabled roof which blends with the residential character of the community. Both the Town and the community are pleased with the completed building.”
“The two ... pre-cast bathroom units ... are still providing excellent maintenance-free service. We ... have asked ... to use the [Easi-Set ”
“These buildings provided maximum
security for our equipment
and required minimum site preparation. They were delivered on
time, set quickly and correctly, and within
just a few hours the building was ready for our HVAC and electrical
installations.”
Therron Dieckmann, Executive Director
Ottawa Recreation Commission, KS “The design process was flexible and accurate. The purchasing
process was simple and accommodating. The delivery was on time
with no problems. And, the product has exceeded
our expectations.
Staff and patrons have enjoyed having new restroom facilities
in our ball field complex. They are functional and easy
to maintain.
They are durable and look great.”
Tom Cooper, Construction COTR
"When these 30’ wide buildings arrived on site it took less than one-week for each to be erected. These buildings ranged from 60’ to 100’ in length. The cost and time advantage over conventional masonry was exceptional. The Turnkey method provided the Project with a timely and cost effective solution to our Electrical Room building construction. The fast track design/build solution placed the first Electrical Room erected on site within twelve weeks after placement of order." |
||
|
|